Step five: tune the final stage power transistor quiescent current, the current value of the power tube by measuring the voltage of the emitter resistance Converter and get.
第五步:调末级功率管的静态电流,该电流值可以经由过程测功率管的发射极电阻的电压换算而得到。
2
Dynamic current testing can detect some faults that cannot be detected by voltage based test method and quiescent current test method.
瞬态电流测试可以检测一些用电压测试和稳态电流测试不能检测的故障。
3
For the tunnel diode parallel amplifier, quiescent operation point, circuit specification and offset voltage are studied.