Severe deformation occurred at the siluric stratum at the ridge of Wushaoling Tunnel, causing splitting of primarylining and even exceeding clearance limit.
乌鞘岭隧道岭脊段志留系地层千枚岩夹板岩地段,施工中发生大变形,初期支护开裂破坏甚至侵限。
2
The calculation of structural load on the lining of tunnel with shallow overburden shows that the load on composite lining will be shared by primary support and secondary lining.
隧道衬砌在浅埋段的结构荷载计算表明,复合式衬砌中的初期支护和二次衬砌一般要共同承担荷载。
3
The primary support and the second lining of large-spanned tunnel have endured different surrounding rock stress because of the influence of structure and span of tunnel.