Finally, the proposed algorithm was improved for solving the unit commitment with ramprate constrains.
最后,将算法进行改进用于求解考虑机组爬坡速率的机组组合问题。
2
This paper presents the solution of optimal power flow (OPF) problem of generator units with ramprate limits and non-smooth fuel cost functions.
提出求解具有非光滑燃料费用函数的存在爬坡率限制的最优潮流方法。
3
Unit ramprate is a very important parameter for unit running, so it must be seriously concerned when dis-patching unit schedule for thermal power system.