In the following test cycle the standard leak will be connected through the chamber at that moment where the test sample will be filled with test pressure.
在测试中,标准泄漏此时将接到气室,而气室内的试件就充满了测试压力。测试结束时,结果就显示在屏幕上。
2
Basing on the test results, the influences of chamberpressure and shelf temperature on sublimation rate and sublimation temperature are studied.
通过实验,研究了冻干过程中干燥箱内压力和搁板温度对升华速度及升华温度的重要作用。
3
The key feature of the experiment is to use a convergent-disvergent nozzle to maintain a high air pressure in the testchamber and at the same time t…