This paper focused EMS industry's production plan optimization, which is the resourceleveling oriented.
本文主要研究EMS行业中面向资源能力平衡的生产计划优化。
2
Tools used in this process include critical path method, schedule compression, what-if scenario analysis, resourceleveling, and critical chain methods.
在这一步中所用到的工具包括:关键路经法,计划压缩,what-if脚本分析,资源水平,关键链。
3
For complex engineering construction system, resource scheduling of limited project duration-resourceleveling is an important and difficult problem.