It has also been constructed in two phases and is equipped with a Sequenced Batch Reactorplant and, soon, with a sludge treatment facility (digesters/centrifuges).
也是分两期建设,采用SBR工艺,配备有污泥处理设施。
2
Loss of coolant accident is considered as design basis accident in the design of nuclear power plant. It is the key point of accident analysis for pressurized water reactorplant.
失水事故是核电站设计的基准事故之一,是压水堆事故分析关注的重点。
3
The stopping behavior of the primary pump has been studied in the experiments and the reactorplant, however, the study on the stopping behavior of the primary helium circulator for HTR is very lack.