In order to solve the problem about the reactorperiod calibrating instrument, a new software signal source based on numerical calculation is presented.
为了解决反应堆周期校验仪存在的问题,提出一种基于数值计算的软件信号源。
2
When the cooling system failed at Japan's Fukushima Dai-Ichi reactor Number 2, the fuel rods boiled through the available water and were for a period of hours exposed to the air.
日本福岛二号核反应堆冷却系统破坏后,核燃料棒将可用的水煮沸,并露出水面数小时。
3
The study on influence factors of the technology was focused on temperature, alkalinity, ratio of inflow duration to reaction period, size of the reactor, and etc.