The theory predictedvalue has not been able comprehensively and reflects the project accurately each kind of change.
理论预测值还不能全面而准确地反映工程的各种变化。
2
Using improved euler method to solve the grey system model was simple and rapid. The predictedvalue accorded basically with the surveying value.
采用改进的欧拉算法求解灰色系统模型简单快捷,预测结果与实测值基本符合。
3
Thus, a single unsigned byte would be dedicated for a predictedvalue, and predicting the 6,005,940 ratings of the test set would require 6,005,940 bytes.