To suit the characteristics of the plateau, the central station management mode will be adopted, with seven central stations established along the line.
管理上适应高原特点,采取中心站的管理模式,全线设置七个中心站。
2
Based on the data from Dongxin station, the situation and potential of rainfall use in Weibei dry plateau were analysed and evaluated.
Chalong Hydropower Station is located in northern Tibet Plateau with high elevation and severe cold. The main dam is an embankment dam with concrete face slab at the highest elevation in China.