The research projects in the actual application of the same-owned power plantstability control programmes have a certain significance.
本课题的研究与实际应用情况对同类自备电厂的稳控方案有一定的指导意义。
2
Almost all six reactor units at the plant are now stable or approaching stability, and power has been restored, enabling the operators to resume controlled cooling of the reactors.
This paper analyses and studies the reasons for the baddish combustion stability of the Boiler No. 3 in Power Plant b, also gives some measures and Suggestions to how to solve these problems.