The freeway tunnel is an inertial plant with lag, and is exposed to a lot of uncertain disturbance.
高速公路隧道是一个带滞后的大惯性对象,存在许多不确定干扰。
2
Test the performance of controller designed in this paper, by doing simulation experiments with the first order inertia plant having the pure lag and time-variation parameters.
以参数时变时滞后过程为被控对象,仿真研究了本文设计的控制器性能。
3
But he worry, wind power forecast data for the prediction accuracy will lag effect, make the wind power plant in assessing the poor performance.