A 330 kV cable line was laid from the Pridneprovskaya Thermal PowerPlant to feed the electric station.
Pridneprovskaya热电厂将铺彻一条330千伏的电缆线为发电站提供电力。
2
To stabilize the reactors and restart cooling systems, the company rushed to reconnect the powerplant to the electric grid.
为了稳定反应堆和重启冷却系统,公司是迅速要重新将电厂和电网连接起来。
3
FutureGen would be a near zero-emissions plant that converted coal into hydrogen, to powerelectric turbines, and carbon dioxide, to be pumped underground.