According to the requirement for reconstruction of wastewater treatment plant, the designcapacity, design criteria, and reconstruction scheme were discussed, and some Suggestions were presented.
针对污水厂的改造要求,对污水厂改造中的设计规模、设计标准和改造方案等进行了探讨,并提出了建议。
2
Research results have been used in construction of commercial plant as a design basis for increasing dissolution capacity and recovery and simplifying surface production process.
所获参数已作为大厂建设的设计依据,可以提高溶矿能力,提高资源回收率,简化地面生产工艺。
3
The results show the water diversion system can satisfy the requirement of specification and design after the power plantcapacity enlargement.