Based on the structural characteristics and site conditions, low level spread assembly and pulling bar group relay lifting method is adopted to install the shell.
施工中针对网壳结构特点及现场施工条件,采用低空外扩拼装、拔杆群接力提升的方法完成了安装。
2
Compared with traditional design methods based on the modular assembly language, this method has improved the readability and maintainability of the code, thus making the relay software more flexible.