This paper deals with the parallel operation of several Numbers of PWM converters for a high powertraction application.
讨论了大功率牵引用几个PWM变流器的并联运行。
2
The experiment results show that the time of the maximum power PTO shaft test and the maximum powertraction test can be decreased from two hours to one hour.
试验结果表明,两小时最大功率动力输出轴试验和两小时最大功率牵引试验均可减少为1小时。
3
The topology and software module structure of PowerTraction Operation Management Information System (PTO MIS) is proposed for its development. The application of ASP in PTO MIS is also discussed.