Besides, this paper have analyzed factors that restrict multi-reservoir system powerstation, and turn former problem into retrained non - linear planning problems.
同时,本文还分析了制约梯级水电站各个因素,将原问题化为一个有约束非线性规划问题。
2
Based on the power supply area of the project and the planning of receiving end power grid, the system design schemes of Zhuzhou converter station and relevant problems are comprehensively analyzed.
The mobile assignment was based on the transmit power of the link as well as cell load in the up link and down link calculation of base station location planning.