Energia plans to have completed testing on the pod, which will have a nuclear power core, by 2020, and have it in service no later than three years after.
Energia计划到2020年完成这个带有核动力太空舱的测试,之后的三年内完成组装。
2
A new test signal method based approach to design power oscillation damping (POD) controller for TCSC is proposed, by which the bulky eigenvalue calculation of state matrix can be avoided.
The most interesting aspect of the design is that the power stored by the pod can be passed to the electric vehicle and vice-versa which will create a shared resource or electric power.