In the model, the concept of antecedent sediment concentration is introduced and the method for simulating the backsilting under the action of wave is established.
If there exists shelter embankment at the water intake area of a power plant, the backsilting at the place of intake and intake canal etc.
电厂取水口建掩护堤后,取水口、取水渠等处的回淤必须在电厂建设之前予以解决。
3
If there exists shelter embankment at the water intake area of a power plant, the backsilting at the place of intake and intake canal etc. must be solved before the construction of the power plant.