Analysis of beams prestressed with unbonded tendon is much more complicated than that of bondedconcrete beams.
无粘结预应力混凝土梁的分析要比有粘结混凝土梁复杂得多。
2
As to bondedconcrete beams, complete bond between steel and concrete is always assumed, so analysis can be performed based on plane section hypothesis.
对于有粘结混凝土梁,一般认为钢筋和混凝土之间理想粘结,从而可基于平截面假定进行分析。
3
P an external non-bonded tendon is a tendon situated outside the original concrete section and is connected to the structure by anchorages and deviators only.