Projectnetwork technique is presently a frequently-used method to make project schedule plan.
目前,工程项目进度计划的编制多采用网络计划方法。
2
This paper presents a new method for constructing the projectnetwork and its computer program.
本文介绍了一种用列表来设计计划网络图的新方法及其计算机程序。
3
Aimed at this crux, a practical algorithm for network plan and control which includes the projectnetwork-plan algorithm and the critical-resource balancing algorithm is presented.