The amepat tool considers these factors and generates a report with projection of expansion factors.
amepat工具能够考虑这些因素,并生成一份报告来提供扩展因数的预计。
3
To control the engineering quality cost control, the following work should be carried out: quality cost projection, plan, accounting, analysis, assessment and report.