The layout of turbinepipeline system in power station should be constructed as required in the drawing of design institute and the actual situation of power station.
水轮机管路系统在电站的布置,应按设计院图纸和电站的实际情况布置施工。
2
The method is introduced to develop mathematical model of gas turbine, centrifugal compressor and gas transmission pipeline needed for load assignment optimization.
介绍了建立优化调度所需的燃气轮机、离心压缩机和输气管线模型的方法。
3
The task of hydraulic turbine type design, is to decide the main property parameter and the structure control parameter, to finish the design of the pipeline of hydraulic turbine.