The pipe moves through these stations as the lay barge proceeds along the pipeline route.
随着铺管船沿管道线路向前移动,管子分别通过上述各站。
2
For determining working parameters during the pipe-laying operation with a lay-barge, the laying method and other working situation of the pipeline must be analyzed.
为了确定用铺管船法铺设海洋管道过程中的作业参数,必须对海洋管道的铺设方式和作业状态进行分析。
3
Tensioner system is a key attachment of pipe laying barge. Its dynamic behaviors directly influence the offshore pipe laying operations. But the dynamic research about tensioner is very rare.