The disposal operation delayed a passenger train en route from Ukraine to Azerbaijan by several hours.
拆除行动使得一趟从乌克兰开往阿塞拜疆的客运列车延误了数个小时。
2
These tiers could categorize methods of operation in conjunction with safety improvements such as separation of passenger and freight traffic and advanced train control systems.
这些安全措施包括将客运流量与货运流量隔离,升级列车控制系统等。
3
Another HSR operation has proposed a 220 MPH service and has also included passenger seating in the power cars (cab cars).