Since few static tests are carried out to determine the capacity of large - diameter concrete pipe pile, dynamic pile test method is widely used to determine its bearing capacity.
在缺少大直径混凝土管桩静载试验的情况下,现在普遍采用了动测试桩的方法确定大管桩承载力。
2
Aimed at the pile foundation in frozen soil of a high voltage transmission line project in Xinjiang Region, a laboratory tensile model test is carried out under artificial frozen condition.
以新疆地区某高压输电线冻土桩基础受力分析为背景,在人工冻结条件下,进行了单桩的室内抗拔模型试验。
3
In order to understand float resisting mechanism and its characteristic a test on the bored cast-in-place pile with enlarged bottom and up-lift resistance pile with equal section is carried out.