The initial corrosion time may be decided by structural protection degree and penetration rate of corrosive agents.
而初始时间(或去钝时间)的确定则取决了结构防护程度及有害介质离于的渗透速率。
2
While drilling in the same formation with the same drilling parameters, the penetration rate of bits of the same degree of wear depends mainly on their cutting structures.