In 2000, pile-drivingmachine was first used in underwater construction in building Nanshi hydrologic station.
应用钻孔桩机建设澜石水文站自记台在水下施工。
2
The problem of crane overload protection of the hydraulic static piledrivingmachine is originally solved by a full hydraulic project through comparison and demonstration in advance in this paper.