A periodofdelay is then determined between when a request (270) is generated and when the modified media stream (241) is desired.
然后确定请求(270)生成时与修改的媒体流(241)被需要时之间的延时时段。
2
If payment of any sum payable under the contract is delayed, the Contractor shall be entitled to receive interest on the amount unpaid during the periodofdelay.
如果延期支付本合同项下应付的任何款项,供应方有权收取未付款项在迟付期间的利息。
3
For all practical purposes, the priority of this task has been lowered during the delayperiod.