Offshoreinstallation is scheduled for the second half of 2017 through to the second half of 2018.
海上安装计划于2017年下半年开始直到2018年下半年。
2
The hookup of storage tanker is the key step in the offshoreinstallation of floating production system.
浮式生产储油船的海上安装连接是单点系泊系统海上安装的关键性工程。
3
The lifting type jacket and integrated deck structure have significantly simplified offshoreinstallation of the platform and greatly reduced the weight of the structure.