The new power plant to be built in Huasco, approximately 700 kilometers north of Santiago, Chile's capital, will consist of a boiler, steam turbine, generator and steam condenser.
Water level of boiler drum in power station is one of the main control parameters for turbine-generator unit, which reflects the balance of boiler load and feed-water indirectly.