Online calculation of heat to power output efficiency of thermal generator set is important for the load coordination control in the CFB boiler thermal generator set.
为解决循环流化床锅炉发电机组负荷变化时的机炉协调控制问题,需要对发电机组的热功效率进行在线计算。
2
Fast temperature rise, high thermal efficiency, with overload capacity at a certain degree to ensure output of boiler.
升温快,热效率高,有一定的超负荷能力,确保锅炉出力。
3
Double section gas occurrence boiler gasification efficiency and thermal efficiency than single sections of furnace are high, there is two gas exports, and output of gas calorific value of different.