The relationship between delay time of the boiler response, the opening time of the valve and the flow through the valve for an actual boiler is obtained.
针对电厂一台实际锅炉,得出了锅炉水位动态响应的延迟时间与伐门开启时间,以及流过伐门流量之间的关系。
2
This paper focuses on effects of the valve characteristics and the transfer pipe delay on dynamic performance for boiler drum level, under varying valve opening of the feed water control valve.
本文着重探讨当给水调节伐门开度变化时,伐门特性以及管路传输迟延对锅炉汽包水位动态特性的影响。
3
It is indispensable to install a suitable pipe union in the pipeline, in proximity to the burner, to allow for easy disassembly of the burner and opening of the boiler door.