According to the item inspection requirement in the Construction Quality inspection Items Division Form (Boiler Installation Part), conduct the acceptance work in each phrase well.
根据《施工质量检验项目划分表》(锅炉安装部分)的项目检验要求,做好各阶段的验收工作。
2
This article describes the basic principles of eddy current test and analyzes the acceptance standards of eddy current test for boiler tubes at home and abroad.
叙述了涡流探伤基本原理,分析了国内外锅炉钢管涡流探伤验收标准,提出了锅炉钢管涡流探伤验收等级标准。
3
The monitoring of environmental protection check and acceptance of CFB boiler shows that the total desulphurization rate reaches from 93.