For retrieving the files in each activity, use another method in the TreeParent object to get the URL of the activity (first-level node) and do a get request on the activity URL as shown in listing 3.
In order to raise the level of the enterprise, and control business costs effectively, the thinking of Activity-Based cost method applied to business costs budget.
为提高企业的成本管理水平,有效的控制企业成本,将作业成本法的思想应用于企业成本预算中。
3
Methods Adoption velocity method with RIA method measurement 81 example cirrhosis get, matched control 30 example serum che activity with cirrhosis marking thing HA level.