The Dielectric Withstand test consists in measuring the current leak of a device under test, while phase and neutral are short circuited together.
电气强度试验包括在测试过程火线和地线同时短路的情况下测量被测设备的漏电量。
2
The neutral assembly contains all the code and it loads whatever satellite assembly is necessary to get the localized resources required by the current user.
非特定程序集包含所有代码,并加载所有必要的附属程序集,以获得当前用户所需的本地化资源。
3
On average respondents were relatively happy, judging their current life as slightly above neutral and experiencing frequent positive feelings and infrequent negative ones.