The port tugboat operationscheduling is a kind of parallel machines scheduling problem with special process constraint.
港口的拖轮调度过程是一类带特殊工艺约束的并行多机调度问题。
2
This optimization approach consists of three parts: The annual MS, the monthly and the daily operationscheduling of power systems.
这种优化方法由相互关联的三部分组成:发电机组的年度检修计划、月和日的运行计划。
3
Operationscheduling is a complicated task with semi-structured character. In this paper, the expert system model using knowledge reasoning for operationscheduling is given.