Power control of a power network is performed in networkcontrolcenter by means of SCADA.
电网的电力控制是在电网调度中心通过SCADA进行的。
2
The data acquisition system is the core scenic area within the networkcontrolcenter by the scenic area of hardware and software, the composition of micro-earth stations and handheld devices.
本系统的数据采集核心是景区内部网络,由景区控制中心软硬件、微型地面站和手持设备组成。
3
In a Stupid Network, control passes from the center to the edge, from the telco to users with an abundance of processing power at their fingertips.