Therefore the general construction process scheme is worked out as follows: opentrench drainage, work site dried in the sun, conventional butt welding, and pipe laid down into trench.
经过调研和反复现场勘察,确定的总体施工方案为:挖明沟排水,作业带晾晒,正常组对焊接,沉管下沟。
2
A new process method, using open annulus distributed holes in place of ring trench as the lateral oxidation Windows, is reported to fabricate vertical-cavity surface emitting laser (VCSEL).