The AT is positioned during the Transition phase and is an integral part of the Deployment discipline.
验收测试被放在移交阶段,并且是部署流程的一个主要部分。
2
Phase theory analysis of spatial integral sampling provide theoretical basis for under sampling aliasing reduction.
空间积分抽样相位理论分析为消减欠采样产生的折叠混淆效应提供了理论依据。
3
Defense-in-depth must be considered early in the design phase of the development process, and must be an integral consideration in all technical decision-making associated with the network.