Don't rotate until holeopener passes through the TGB.
再扩眼器通过临时导向基板之前不要旋转。
2
Run holeopener to sea bed.
下扩眼器到海底。
3
The working principle and the influences of construction parameters of the soil opener on the length and the width of soil hole formed by spade on the soil surface were analyzed.