The invention relates to a final elevation control method for opencaissonconstruction, belonging to the technical field of opencaissonconstruction.
本发明涉及一种沉井工程最终高程控制方法。本发明属于沉井工程技术领域。
2
The presented computation methods are also applicable to stability analysis of catch drain, impended wall, opencaisson and other excavation works during construction.
所述计算原则和方法也适用于分析截水槽、倒挂井、沉井及其他土石开挖工程在施工期的稳定性。
3
Opencaisson well construction technology is widely used in industrial and civil structures, highways, Bridges etc., but comparably less in water conservancy and hydropower project.