The paper will center onthehazard management of construction engineering to make a systematic research.
本文将围绕建筑施工中的危险源管理展开系统研究。
2
Based on a prior information onthe reliability or onthehazard rate, the posterior distributions of reliability parameters, such as reliability, reliable life, are derived.
The effects of nitrogen, phosphor and kalium onthehazard index of holing illness and the prophylactic-therapeutic measures has been studied while the field experiment had been applied.