A substation is on the territory of the GRES-1. Its main task is to distribute the electric power produced by the station.
在GRES - 1内建有一个变电站,它的主要任务是配送发电厂的电能。
2
Distribution and capacity of the traction substation facility shall satisfy the requirement of the velocity aim traffic volume marshalling and running interval of main line.
牵引变电站设施的分布与容量应满足干线的速度目标、交通量、编组以及运行间隔要求。
3
As the hinge of electric power, the mine substation is one of the main objects that the safe production takes charge of.