Since the main test runner is HTML based, having a browser open is a necessity.
由于主要的测试运行器是基于HTML的,因此打开浏览器是必须的。
2
The main parameters of model runner and model machine designed and developed for turbines transformation at Shizitan Power plant are analyzed. Design Considerations and test results are presented.
为狮子滩电厂水轮机增容改造研制和设计的模型转轮及模型机的主要参数分析与设计思路和试验研究结果。
3
The technology for boring-reaming the bolt hole of pin connecting original main shaft with new runner of turbine in site of Danjiangkou hydropower plant and its effect are described.