This paper introduces the layout plan, selection of design data and main design steps of rain water piping system of large and medium-scale plants.
介绍大中型企业厂区雨水管道系统的平面布置、设计数据的选取和主要的设计步骤。
2
Project and system situation in Zouxian Power Plant were introduced, and the piping design parameters and the piping material of main steam system and main feed water system were determined.
Reduced air piping with service valves must be foreseen alongside the walkway on main deck until the fore store room inclusive. The position will be determined together.