The computing model result in the separation of the influence of machineutilization, sequential job service rate, and parallel task allocation to the parallel task completion time.
通过这个计算模型可从机器利用率,连续工作服务速率,并行任务分配等方面对并行任务完成时间进行预测。
2
The recovery system of residual heat from flue gas can reduce the flue gas temperature of direct-fired machine and increase the primary energy utilizationrate of direct-fired machine in summer.
烟气余热回收系统不仅降低了直燃机排烟温度,还提高了夏季直燃机的一次能源利用率。
3
Equipped with automatic feeding device (double-side feeding can be customized) to enhance utilizationrate and safety of machine.