Research on Bill of Material and MaterialRequirementsPlanning in MRP System;
研究了提前期不确定情况下总装生产物料需求计划的优化问题。
2
It was studied that Theory of MaterialRequirementsPlanning and designed of MaterialRequirementsPlanning System.
对物料需求计划的理论和方法进行研究,并对物料需求计划系统进行逻辑计划。
3
How do MRP (" MaterialRequirementsPlanning "), MRPII (" Manufacturing Resources Planning "), and ERP differ? To what degree do they address the problems of their respective "predecessors"?