So I started cutting the material per the materiallist on the print.
于是我开始按打印的材料清单开始下料。
2
Complete materiallist for order, self check and submit to superior for double check and audit.
完成下订单所用材料清单,自我检查核对后,提交给领导进行核对。
3
With the instance of LNG project in Guangdong, several critical points in materiallist document were presented in this article, and at the same times, the relevant analysis was carried out.