Based on the cable-stayed bridge using method of cantilever, the paper establishes the optimization model of construction phase with multi-objective and multi-constraint and gives the example.
采用多目标、多约束的优化方法,以悬臂施工主梁的斜拉桥为例,建立了施工阶段的优化模型,并给出算例。
2
To simulate the cluster formation in dense two-phase flow, a multi-lattice actual trajectory (MLAT) model is developed.
提出了数值模拟稠密气固两相流动的多重格子-真实轨道模型(MLAT模型)。
3
A novel multiphase permanent magnet motor's mathematical model that combines multi loop theory of AC motor and finite element method of electromagnetic field is proposed in the paper.