The most ominous sign that something big was brewing under the mountain developed on its north side. Within four weeks, this flank bulged out with hitherto unknown speed (see Figure 1).
The connecting rod on the cargo boom is hinged with a shaft (38) simultaneously, is extended and bulged to the external side to form a supporting shaft.